Twin Star Home – Charleston Trade Center

423 Trade Center Parkway
Summerville South Carolina

Developer/owner: The Keith Corporation, Charlotte

Architect(s): McMillan Pazdan Smith, Charleston

General contractor: Frampton Construction, Ladson

Engineer(s): WGPM Inc., Charlotte (Structural Engineer); Alliance Consulting Engineers, Charleston (Civil Engineer)

Estimated completion date: December 2021

Estimated total cost of project:

Project description: Constructed of concrete tilt walls and a structural steel frame, this 1,019,200-square-foot cross-docked facility has a 40-foot clear height, with 120 dock doors and two drive-in doors. The site has 275 trailer parking spaces and 474 car parking spaces. Frampton is completing an interior upfit for incoming tenant Twin Star Home, who will occupy the whole building.


Charleston Under Construction

Charleston Under Construction publishes periodically online and bi-monthly in the print edition of the Charleston Regional Business Journal.

Click to submit items for Charleston Under Construction.

Click for advertising information about Charleston Under Construction.