City of Greenville Fire Station No. 3

20 E. Faris Rd.
Greenville

Developer/owner: City of Greenville, Greenville

Architect(s): ADW Architects, Charlotte, NC

General contractor: Hogan Construction Group, LLC, Greenville

Engineer(s): Seamon Whiteside & Associates, Greenville (Civil Engineer)
Britt, Peters & Associates, Greenville (Structural Engineer)
Burdette Engineering, Greenville (Electrical Engineer)
Optima Engineering, Charlotte, NC (Plumbing, Mechanical, Electrical & Fire Protection)

Estimated completion date: December 2020

Estimated total cost of project:

Project description: The first floor of the new 12,908 SF facility will house two drive-through apparatus bays along with storage rooms, a spacious lobby, restroom, an ice and vending machine area, and offices for the Lieutenant and Captain. The second floor will serve as the living quarters, complete with bunk room, locker room and showers for eight firefighters, as well as an officers’ bedroom with shower, laundry room, and a full-sized kitchen with a day room and dining area.


Upstate Under Construction

Upstate Under Construction publishes periodically online and bi-monthly in the print edition of GSA Business Report.

Click to submit items for Upstate Under Construction.

Click for advertising information about Upstate Under Construction.